Samsung to break ground on KRW6 trillion Onyang HBM packaging plant in September
DIGITIMESen

Samsung Electronics will break ground in September on a KRW6 trillion (approx. US$4.31 billion) HBM production and advanced-packaging facility at its Onyang campus in Asan, South Korea, after the project cleared a provincial urban-planning review. The move advances a broader capacity buildout to meet growing AI memory demand.
This is a short summary published by AI Global Wire. The full article is owned and hosted by DIGITIMES — open it there to read it in full.
Read the full story at DIGITIMES- Verktyg
Related AI news
- Delta expands AI automation push into robotics, semiconductors, machineryDIGITIMES · August 20, 2026
- Optimized Fuzzy Logic Approach with the IEEE Key Gas Method for Diagnosing Power Transformer Faults Using Dissolved Gas AnalysisarXiv cs.AI · August 20, 2026
- SESSE: Sketch, Expand, Sort, Summarize, Evaluate -- LLM-as-Judge Evaluation via Structured DecompositionarXiv cs.AI · August 20, 2026
- Measuring the Partial-Credit Gap: A Strict Benchmark on Vietnam's 2025 Convex Marking SchemearXiv cs.AI · August 20, 2026
- Emergence of Agentic AI: A Review on Evolution, Background, Working Principles, Applications, Adoption Factors, and Future Research DirectionsarXiv cs.AI · August 20, 2026
- Cacheable by Design? Training Mixture-of-Experts Routers for Locality Against the Edge Memory-Bandwidth Wall: A Pre-Registered Negative Result with a Systems Measurement StudyarXiv cs.AI · August 20, 2026